3.29.2013

More Updating - AC at the North Pole

This morning Kate and I shot another redo of one of our original photographs in preparation for NSS: AC at the North Pole.  This was another of the very first photos we ever took way back when Kate just used a crummy point-and-shoot digital camera.  I have to say the redo is a big improvement - other than my modeling skillz.  Those have always been awesome.


3.24.2013

NSS Wall Construction Part 2

Kate returned from her Dad's workshop tonight with exciting news - they finished making her NSS wall!  Or at least the base of it.  They still need to paint it and put all the attachments on and whatnot.  But at least the woodworking part is finished.  Check out the photos she brought back to show me:

Clamping down the frame backs.

Putting hinges on the backs between the top and bottom panels.

One finished panel.

Two.

And three.

And four.  Hurrah!

3.14.2013

iPhone Cases by Griffin

Big news!
Kate Funk has joined forces with Griffin who will now be offering iPhone cases with her designs on them as part of their new Designer Series.  They are currently offering all 8 designs pictured below in both iPhone 4s and 5 sizes.  Go check it out here!


3.13.2013

NSS Wall Construction Part 1

Kate took the first of many trips to her Dad's workshop today to work on building her walls for the NSS show coming up.  Although today was mostly planning they got started on some building and Kate brought some photos back to show me.


Kate's job was gluing, stapling, and clamping the support beams together.


The floor turned white from all the sawdust.
 
There were lots of breaks to fill and smell the maple syrup cooker outside.

 
 I'll keep you updated as more progress gets made in the coming weeks.  Later!